❗️Proposed Iraq-Syria oil pipeline championed by US faces severe delays and massive costs An ambitious pipeline project linking Iraqi oil fields to the Syrian Mediterranean port of Banias will require at least four years to construct and a minimum investment of $15 billion, according to industry sources cited by Reuters. This timeline doubles the projections previously estimated by US officials who promoted the initiative as a strategic alternative to bypass the Strait of Hormuz. Rather than repairing the heavily damaged historic Kirkuk-Banias infrastructure, engineers would need to build an entirely new transport network connecting northern and southern Iraqi fields through Haditha to the Syrian coast. While Washington insists the proposed conduit could eventually handle an initial capacity of two million barrels per day, comprehensive feasibility studies have barely commenced, and complex hurdles involving land rights and regional clearances remain unaddressed. The undertaking highlights urgent search for alternatives as export routes face extreme bottlenecks. Prior to the ongoing US-Israeli war on Iran, Iraq regularly shipped roughly 3.6 million barrels daily, predominantly through the Strait of Hormuz, whereas restricted shipments through the vital passage plummeted to a mere 35.5 million barrels total during the month of July.